Dug and leveled the aerobic tank hole. Pumped out the existing septic tank and reused it as an extra trash tank. Set the aerobic tank and tied it into the septic tank. Ran 70’ of sprinkler lines setting 2 sprinkler heads back to back spraying 180°. Ran wire from the disconnect to the control box.
Filled the tank with water and tested all is working.