Completion date: December 1, 2025
Location: Depew, OK
Ran all new PEX water lines and tied them into the system. Replaced the existing manifold with new and installed a new NOVO system along with a whole-house water filter. Insulated all water lines throughout the attic for added protection. Performed a full system test and confirmed proper operation with no leaks.
John