Completion date: December 1, 2025
Location: Kendrick, OK
Cut and removed existing concrete to access gas line. Replaced approximately 4 feet of 3/4” poly gas pipe and installed a new 3/4” gas riser. Pressure tested the repaired section at 20 PSI for 30 minutes to ensure system integrity. No leaks were detected and everything is operating properly at this time.
Robert