Completion date: March 19, 2026
Location: McLoud, OK
Installed and properly wrapped all chamber rows, maintaining a consistent depth of approximately 26–30 inches across 95% of the system. Performed initial grading to achieve proper elevation before installation, ensuring optimal depth without over-excavation. Completed two chamber rows distributed in four directions. Relocated and worked around an existing wood pile as needed, including additional grading to maintain consistent depth requirements.