December 1, 2025 | Kendrick, OK
Cut and removed existing concrete to access gas line. Replaced approximately 4 feet of 3/4” poly gas pipe and installed a new 3/4” gas riser. Pressure tested the repaired section at 20 PSI for 30 minutes to ensure system integrity. No leaks were detected and everything is operating properly at this time.
November 20, 2025 | Chandler, OK
Installed a new 40-gallon electric water heater, including all necessary fittings and connections. Verified proper electrical supply, ensured secure installation, and performed a full system test to confirm correct heating, safety function, and no leaks. All components operating properly at completion.
November 18, 2025 | Stroud, OK
Replaced the Mansfield toilet flapper and installed a new shut-off valve in the master bathroom. Tested the system thoroughly—everything is working properly.